“We experienced a loss of phase one night, as the local power company blew a fuse leading to the site. When I arrived, both transmitters were still on air and running at reduced power. The auxiliary transmitters were dead. I was shocked and amazed!”

-Bill Eisenhamer, Chief Engineer
 
 
GV-Series-Family-Awards-250

Learn more about the GV Series »

 

GV Series Brochures »

 

GV Series Spec Sheets »

 
 

“I love the AUI and remote accessibility – it is a great tool. With VPN and web access, I can monitor the transmitters anywhere.”

-Bill Eisenhamer, Chief Engineer
 

 
HD Radio DRM logos

KIFM and KBZT install first two Nautel NV20s on air in the U.S.A.

 

In 2008 KBZT and KIFM in San Diego were slated for their HD installations. Having a couple of years under our belts with our third station, we thought we knew where we were headed. As it turned out, 2008 became a very interesting and complex year for our facilities. We’d just finished a very rushed but successful studio remodel, completed a studio move, and now we had to plan for our HD installations. To add insult to injury we were also in the middle of rebuilding our AM tower that had come down during a storm at the end of 2004. Squeak in an Class A station HD installation for KSOQ, and you have a handful.

The planning began with the location. The KBZT and KIFM transmitter site was a nice location, but the room was quite small and space was limited. Each Class B station runs a TPO of 10kW, and each must maintain a full power auxiliary transmitter. The power level created the main headache as the transmitter had to be sized to maintain this analog output level and produce the required power for the digital. The year began with us considering a handful of transmitters that were either too large as a single box or too large when combined; essentially requiring four transmitters to replace two. Mounds of various drawing configurations piled up. April arrived and the NAB convention gave us an opportunity to see what some of these beasts looked like and what they did.

Wandering the NAB floor for a specific goal was interesting. The typical re-acquaintance session occurred whilst looking at the various transmitters. Our company had a meeting with Nautel to see their latest and greatest. Jeff Welton told us about the new NV40 solid state transmitter. Being the assistant at the time, I hung near the rear of the group to allow the others (decision makers) to ogle the NV40 closely. As Jeff’s presentation continued, I began to size up the box. Power-wise it was too much for our needs. Physically it was still a bit too large. Yet, the presentation was intriguing. As the presentation wound down I commented from the rear of the crowd, “Cut that in half and I may buy one.”

The year progressed, more plans were configured – a decision had to be made. I received information regarding the new NV20 transmitter from Nautel. As I was doing the drawings and space planning, the dimensions were directed to me – two NV20s were a perfect physical fit, plus the price was right. I reported back to Nautel that if they could be delivered within our required time schedule, they would fit our needs perfectly. As the year moved into the third quarter the drive to install ramped up. I found myself promoted to Chief Engineer. Now the project was fully in my hands along with the AM tower construction and our Class A station HD install. I called up Jeff to find out what we’d recently submitted for purchase and what our timeline was, as once the planning and drawings were complete, I was not in the loop regarding final purchase until my promotion. Jeff gave me the run down and I supplied the required information for the transmitters. As it turns out we also purchased a Nautel V1-D for the Class A station. The price was right, the size was right. Now the delivery had to be right. All the equipment was required on site no later than December 31st. We were assured that it would be, including the V1-D.

December 2008 became quite busy. The construction of the AM tower was in full swing. Storms were delaying everything. We took delivery of the V1-D well ahead of schedule from Nautel on December 10th and had it on the air by December 19th. Now we turned our attention to the NV20s. The old transmitters were removed on December 22nd and we took delivery of them on Christmas Eve late in the afternoon. JR and I sat waiting for the truck for nearly six hours in what had to be the coldest day in San Diego in years. As typical delivery companies go, no tools to properly move the transmitters were available. By 4pm we finally had the transmitters in place. The first two production models of the NV20 in the United States, serial numbers H103 and H104, sat in our transmitter room.

Bill Eisenhamer with two Nautel NV20 transmitters

After a well-deserved weekend we began installation of the transmitters. Working with emailed copies of a manual in progress I had the first transmitter plumbed and running into a RF load on December 31st. Mind you it was FM only, but it was running. The second transmitter was plumbed and running, FM only, into a load by the end of the second week of January, 2009. We were ready to have Nautel come out and commission the boxes. I had great support from the technical staff and Scott Marchand. Any question was answered in a timely manner.

The first NV20 was on the air January 28, 2009. Nelson Bohorquez was on site for commissioning. JR and I both learned much about the nuances of creating the HD during this exercise. We also impressed Nelson on our ability to diagnose and troubleshoot the untested network during this time. The second transmitter aired on January 29th. Due to some interesting issues with the second transmitter it took until February 13th to go on air in full FM + HD. As with any new product we experienced some minor issues, but nothing that threatened the on-air performance. Nelson Bohorquez was on site for the on air debut. Scott Marchand and the rest of the Nautel crew were at the ready. It was a big deal. I appreciate all the help from the whole staff.

Since the installation we have performed a number of software updates which were easy to perform, some of which were intermediate to final releases. A beta test site, if you will. Actually, a “reality” test site, as it turned out. We monitored the transmitters closely and reported anything that may need attention. We gave suggestions. In our curiosity we experimented on access to the Exgine of one exciter. We clicked on the “wrong” answer and crashed the card. A timely repair from Nautel corrected the issue.

We experienced a loss of phase one night, as the local power company blew a fuse leading to the site. When I arrived, both transmitters were still on air and running at reduced power. The auxiliary transmitters were dead. I was shocked and amazed! Even with one phase down my two Nautel transmitters continued to run! Due to heat build-up in the room, I chose to run only one and after three hours the power company restored power and I was back on full power with both. Now that’s what I call great power distribution!

I love the AUI and remote accessibility – it is a great tool. With VPN and web access, I can monitor the transmitters anywhere. The logging keeps me informed of any potential issues.

A year later and the Nautel NV20s are running like champs. We upgraded our HVAC to accommodate the heat load. We continue to monitor the transmitters. They work. Thanks for the support Nautel.

Bill Eisenhamer
Chief Engineer
Lincoln Financial Media Co. of CA
KSON/KIFM/KBZT/KSOQ


North America Toll Free: 1.877.662.8835
International: +1.902.823.5131

North America Toll Free: 1.877.628.8353
[email protected]

International: +1.902.823.5100
[email protected]

India: +91 7042694841
[email protected]